Are land lots on the Big Island a smart buy, or am I underestimating what it costs to build here?
Land lots on the Big Island can be a smart buy, but only if you've priced what it costs to build here as well as the lot. Before a home goes up, you'll need plans, a county permit that's averaging about three months to approve, and contractors in a market short on skilled labor.
Key takeaways
- Most land sales are in Puna: 641 of the island's 1,025 land sales from January through September 2026 were there.
- Land prices vary widely: in September 2026, the median lot sold for $41,000 in Puna and $823,500 in South Kohala.
- Permits take time: the county says residential permit approval averages three months, and it can take up to a year.
- Several agencies review your plans: the county's building, planning and engineering staff and the State Department of Health can all weigh in.
- Weigh a finished home too: buying a built single-family home skips the building permit and the build.
“They have regulations for their regulations. They have rules for their rules, and they have paperwork for their paperwork.”
Dan Polimino
What are land lots selling for on the Big Island?
Land lots on the Big Island sold for a median of $58,000 from January through September 2026, and most of those sales were in Puna (Title Guaranty’s Hawaiʻi Island report).
| District | Land sales, January to September 2026 |
|---|---|
| Puna | 641 |
| Kaʻū | 181 |
| South Hilo | 59 |
| North Kona | 36 |
| North Kohala and South Kona | 34 each |
| South Kohala | 27 |
| Hāmākua | 7 |
| North Hilo | 6 |
| Island total | 1,025 |
Prices on the west side run far higher. In September 2026, the median lot sold for $823,500 in South Kohala, from just four sales, and $41,000 in Puna, from 50. The two sides are different markets, so read what the Big Island offers before you shop by price.
What does it take to get a permit to build a home on the Big Island?
Getting a permit to build a home on the Big Island takes plans, a licensed contractor or an owner-builder, and a review by several county and state agencies (County of Hawaiʻi Building Division). The county suggests these steps:
- Check with the Planning Department what the zoning allows and where the setbacks are
- Ask the Engineering Division about any flood requirements for the lot
- Have plans drawn, usually with an architect or engineers
- Hire a licensed general contractor, or take it on as an owner-builder
- Apply through the county’s online permit system, EPIC, with any other approvals the plans need
- Pass inspections as you build, then a final inspection before anyone moves in
The county says approval can take anywhere from 3 weeks to a year. Its current average for a residential permit is 3 months.
What costs come with building on a Big Island lot besides the land?
The costs that come with building on a Big Island lot besides the land include design, permits, site work and the construction itself, and each one takes time. Budget for these:
- An architect or engineers, depending on the project
- Permit fees, plus the months of review
- Other approvals some plans need, such as the State Department of Health’s approval of an individual wastewater system
- A water tank or catchment system, if the lot needs one, which takes its own permit
- A construction loan, if you’re financing the build
Labor is the other big cost. Skilled tradespeople are hard to book here, which is why big remodels cost so much on the Big Island. Get a builder’s estimate and a timeline for the home you want before you buy the lot.
Is a land lot or a finished home the better buy on the Big Island?
For a high-net-worth investor, a finished single-family home is the better buy on the Big Island in my view, and a land lot suits someone with time and a full budget for the build. Here’s how the two compare:
| Land lot | Finished home | |
|---|---|---|
| When you can move in | Once the build passes its final inspection | Soon after closing |
| What you control | The whole design | Only what you change later |
| What can go wrong | Permit delays and cost overruns | Repairs the inspection didn’t catch |
To see what a finished home costs at each price level, read what luxury costs on the Big Island.
Sources
Frequently asked questions
Can I live in a tent on my Big Island lot while I build?
You can't live in a tent on your Big Island lot while you build, because the county's construction code says tents can't be used as a residence. Construction trailers, water tanks and fences used during a permitted build need a temporary permit. It runs up to 180 days, and the county can extend it up to 90 days at a time.
Do I need a licensed contractor to build a home on the Big Island?
You need a licensed contractor to build a home on the Big Island unless you qualify as an owner-builder under state law. Electrical and plumbing work have their own rules, and in most cases a licensed electrical or plumbing contractor has to do it. Read the state's brochure on an owner-builder's risks before you take that route.
Does a Big Island land lot need its own water system?
Whether a Big Island land lot needs its own water system depends on whether water service reaches it, so ask before you buy. Some owners use a water tank or catchment system. The county requires a permit to install one for household use or fire protection, whatever its size.
Should I buy a Big Island lot now and build later?
Buying a Big Island lot now and building later can work if you've already checked the zoning, setbacks, water and wastewater, and priced the build. Rules and costs can change while you wait, and you'll pay property tax on the lot in the meantime. Plan the build before you buy, even if you start it years later.